Projects

Pickering Hotel

Completion: February 06, 2023

Location: Pickering

Size: 190,000 sq. ft.

Kelson was the mechanical contractor on this exciting new Pickering Hotel project. This is a 15 storey, 225 guestrooms in a luxurious five-star hotel tower, designed with style and personality connected to the Pickering Casino and future 2,500-seat concert venue. Located minutes away from downtown Pickering this facility will be a major tourist attraction. The hotel also features a modern spa and fitness room.

 

Kelson mechanical highlights: Mechanical systems for the hotel level 4 to 15th floor, including all drainage, water lines and all plumbing fixtures. This included tie in to existing plumbing lines at hotel. HVAC system for hotel including Chilled Water and Heating Water. Installation of Air Handing Unit – 26 include for accepting delivery, off loading and hoisting to roof and start-up of units. All mechanical systems for the Arena, including testing and balancing. Complete BAS control system, integrated automation, and insulation and firestopping.