Projects
Guelph South End Community Centre
Location: Guelph
The South End Community Centre (SECC) is a 160,000 square foot facility with twin ice pads, aquatic center with a lap and teaching pool, double gymnasium, walking track and multi-purpose rooms, all connected by a central lobby. The facility’s green initiatives align with the City’s community net zero carbon and corporate 100 per cent renewable energy goals, and the Canada Green Building Council’s Net Zero Carbon design criteria.
Mechanical Systems
Mechanical systems include: 3 Gas fired boilers, 2 electric boilers, Buried duct serving pool, 10 roof top units, including 1 pool dehumidification unit, In-floor heating, 38 pumps, Gas fired Generator, 3 chillers, Snow melting systems.